Site Event/Activity record ELI13715 - Boston Tidal Barrier Project: Right Bank Grain Hoist Photographic Survey
Location
Grid reference | Centred TF 3296 4282 (11m by 7m) Estimated from sources |
---|---|
Civil Parish | BOSTON, BOSTON, LINCOLNSHIRE |
Technique(s)
- Building Survey
Organisation
Mott MacDonald
Date
From 01 Jan 2014 to 26 Sep 2017 (intermittent)
Description
A building survey of the right bank grain hoist at the Port of Boston. The grain hoist was demolished in 2017. {1}
External Links (0)
Sources/Archives (1)
- <1> SLI17203 Report: Mott MacDonald. 2022. Boston Tidal Barrier Project: Right Bank Grain Hoist Photographic Survey. -.
Related Monuments/Buildings (1)
- MLI126139 Right Bank Grain Hoist, Port of Boston (Building)
Record last edited
Nov 24 2022 9:14AM